Tempe Epoxy Pros logoTempe Epoxy ProsEpoxy Flooring · Tempe, AZ
Concrete Floor Leveling photo

Tempe Epoxy Pros

Concrete Floor Leveling in Tempe, AZ

Concrete floor leveling in Tempe, AZ to prep uneven slabs before coating. Self-leveling compounds for garages and interiors. Free estimates.

  • 15+ Years local experience
  • 500+ Projects completed
  • Licensed & Insured

Serving Tempe and nearby communities.

Is your garage or patio slab noticeably uneven, with dips, low spots, or standing water after it rains? Concrete floor leveling fixes that before any coating goes down, since epoxy and polyaspartic systems follow the shape of whatever's underneath them. Tempe Epoxy Pros uses self-leveling compounds to flatten older slabs, a common need in Tempe homes built decades ago where settling has created low spots over time.

This is prep work, not a standalone cosmetic fix. It's typically paired with a coating project, though it can also be done on its own ahead of tile, flooring, or other finish work.

What's included

What's Included With Concrete Floor Leveling

Typically included: elevation survey, surface cleaning, crack pre-treatment, self-leveling compound pour, smoothing pass, cure inspection.

Optional: fiber-reinforced compound for added strength on larger low spots, moisture mitigation primer if vapor testing flags an issue.

Customer prep: clear the area completely, since the leveling compound needs an open, unobstructed pour.

How it works

How Our Concrete Floor Leveling Process Works

  1. Floor Elevation Survey photo
    Step 1

    Floor Elevation Survey

    A survey identifies low spots and height variations across the slab.

  2. Surface Cleaning photo
    Step 2

    Surface Cleaning

    Dust and debris are removed to allow leveling compound to bond properly.

  3. Crack Pre-Treatment photo
    Step 3

    Crack Pre-Treatment

    Existing cracks are addressed before leveling material is poured.

  4. Self-Leveling Pour photo
    Step 4

    Self-Leveling Pour

    A self-leveling compound is poured and spread across uneven areas.

  5. Smoothing & Finishing photo
    Step 5

    Smoothing & Finishing

    The leveling compound is smoothed to achieve a flat, uniform surface.

  6. Cure Time & Inspection photo
    Step 6

    Cure Time & Inspection

    The leveled floor is left to cure and then inspected for flatness.

Materials

Materials and Methods for Concrete Floor Leveling

  • Self-Leveling Underlayment photo

    Self-Leveling Underlayment

    A flowable compound fills low spots common in older Tempe slabs and creates a flat substrate for coating.

  • Fast-Setting Leveler photo

    Fast-Setting Leveler

    A quick-setting formula reduces downtime between leveling and the coating install that follows.

  • Bonding Primer photo

    Bonding Primer

    A primer improves adhesion between decades-old concrete and new leveling material.

  • Fiber-Reinforced Compound photo

    Fiber-Reinforced Compound

    Fiber additives increase strength and reduce cracking in thicker leveling pours.

  • Polymer-Modified Mix photo

    Polymer-Modified Mix

    A polymer blend improves flexibility and durability as the slab continues to shift slightly with heat cycles.

  • Moisture Mitigation Primer photo

    Moisture Mitigation Primer

    A primer reduces moisture transmission from below, important on slabs without a modern vapor barrier.

When to call

When to Call for Concrete Floor Leveling

Call Tempe Epoxy Pros for a free assessment if any of these sound familiar.

  • Water pools in one spot of the garage or patio after rain or hosing down
  • The floor visibly slopes or dips when you walk across it
  • A new coating keeps failing in the same low-lying area
  • You're planning tile, epoxy, or another finish and want a flat base first

Before & after

Before and After Concrete Floor Leveling Results

  • Concrete Floor Leveling photo
    Before
  • Concrete Floor Leveling photo
    After

FAQs

Concrete Floor Leveling FAQs

How do I know if my floor needs leveling?

Visible dips, pooling water after rain, or a coating that keeps failing in the same spot are the clearest signs the slab underneath isn't flat.

How much does concrete floor leveling cost?

Pricing depends on the severity of the unevenness and square footage involved; a free estimate will give an exact range for your slab.

Can leveling be done at the same time as an epoxy coating?

Leveling is almost always done as prep work right before the coating system goes down, in the same overall project.

How long does the leveling compound need to cure?

Most self-leveling compounds need about a day to cure before coating work can start on top of them.

Will leveling fix cracks too?

Leveling addresses unevenness, not structural cracking. Cracks are pre-treated as part of the leveling process but may need separate crack repair first if they're significant.

Is leveling necessary for every garage coating job?

Only slabs with noticeable dips or slope need it. A flat, even slab can go straight to surface prep and coating.

Next step

Get a Concrete Floor Leveling Estimate in Tempe

Call Tempe Epoxy Pros at +1 (928) 249-9538 for a free assessment of your slab and a leveling estimate.

Ask about Concrete Floor Leveling

Tell us about the project and how to reach you.

Call (928) 249-9538